inkpm logo
Hetherington House
Hetherington House
A £4m new office for British Mediterranean Airways. This project presented particular difficulties due to a major variation from the original brief. Mid way through the design and build project, INK were required to include the tenant fit-out as part of the project. This required significant design and timing changes as well as major cost control and contractor negotiation challenges.